The terminal is located on the left bank of the Escaut River. Since July 2016, a new lock is operational and constitutes a major asset for the development of this site, with a draft now reaching 15.5 meters. When complete, the storage capacity will reach 500,000 m³, with possible extensions for storing chemical products and gases.